Second production MC-21-310 handed over to the flight test station of the Irkutsk Aviation Plant
The Irkutsk Aviation Plant (PJSC Yakovlev, UAC) has moved the second production MC-21-310 from the final assembly shop to its flight test division. The aircraft is intended for Aeroflot Group and has been assembled in the import-substituted configuration.
The aircraft will now undergo ground preparation, systems checks and PD-14 engine runs. The first production MC-21-310 made its maiden flight on 3 August 2026. According to the plant, 18 MC-21-310 aircraft are simultaneously at various stages of assembly.
Flight testing is scheduled for completion in the first quarter of 2027, with the type certificate and the start of deliveries expected in the second half of 2027. Eight aircraft are to be delivered in 2027 and ten in 2028; the target production rate is 36 aircraft a year by 2030–2032.
Source: Aviation of Russia, based on materials from the Yakovlev PJSC press service, 31 August 2026

